Journal of Production Engineering

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut ero labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco.

GUIDE FOR AUTHORS SUBMIT MANUSCRIPT
Vol. 23 No. 1 (2020)
Original Research Article

Production estimation and delay analyses of a locally fabricated band saw

Temidayo E Omoniyi
University of Ibadan, Faculty of Technology, Department of Wood Products Engineering, 200284, Ibadan, Nigeria
Musiliu A. Onilude
University of Ibadan, Faculty of Technology, Department of Wood Products Engineering, 200284, Ibadan, Nigeria

Published 2020-06-30

abstract views: 17 // FULL TEXT ARTICLE (PDF): 13


Keywords

  • Productivity,
  • band saw,
  • delay analyses,
  • working cycle,
  • maintenance

How to Cite

E Omoniyi, T., & A. Onilude, M. (2020). Production estimation and delay analyses of a locally fabricated band saw. Journal of Production Engineering, 23(1), 29–34. https://doi.org/10.24867/JPE-2020-01-029

Abstract

The objective of the study was to estimate the productivity of a locally fabricated band saw using delay analyses in order to achieve improved production and judicious utilization of available resources. A time and motion study was applied to collect the data for the processing system, and the data were recorded and processed. The working cycle of the machine was also recorded, along with all variables that affect productivity. The results show that productivity was significantly affected by the log supply characteristics, sawing patterns, maintenance of equipment, and the level of training. This reveals the need to improve equipment availability and maintenance during sawing.

PlumX Metrics

Dimensions Citation Metrics